To find out how - Telephone: 01633 53 54 55 or Email (see contacts)
Micaul Solar are Grant Approved Accredited Installers under the BRE Microgeneration Certification Scheme MCS1074 |
|
Micaul Solar First Company in Wales to be Microgeneration Accredited for Heat Pumps and Solar Thermal
|
Renewable Energy Feasibility Study Our new build renewable energy feasibility study investigates the potential renewable energy heating, hot water and electricity generation and other options that could be considered for new developments. The primary considerations that underline this study for each option are:-
Suitability Suitability of the geography, environment, building and its orientation. In the case of external equipment, the possibility of impact from vandalism. Capital Cost With respect to the design, supply and installation costs. Estimated costs will be detailed for each system under consideration within its own section. Operating Cost With respect to post installation and commissioning maintenance equipment and maintenance costs.
Ease of Operation Level of training and skill sets required to operate. Level of automation.
Environmental Impact With respect to COČ savings and emissions.
In addition, the study highlights a number of additional technologies and products that may benefit the development for example: by reducing lighting requirements, water usage, heating distribution.
A guidance note has been is also included that details renewable energy financial support, vat and planning guidance.
The information contained is intended to provide a guide which can be used to determine which options would be most suitable during the design development and cost assessment of the development.
Please note that the estimated costs provided are estimates only and are subject to supplier and product chosen, design and integration and installation costs. In addition, the performance of any renewable energy systems is impossible to predict with certainty due all performance estimates are given as guidance only and should not be considered as a guarantee of performance.
Energy costs used are based on average costs at the time of the study being drafted.
Example charts included in study....
To find out more, contact us on 01633 53 54 55
|